Thursday, August 14, 2014

Shakedown cruise

Gragodeo is for sure not cruise ready, but it was good to have some fun with the kids, spend some time on the boat and start to get a feel for how she's going to perform.

One of our favorite spots to anchor in the Ohio River is in a town called Manchester, which is about 70 miles up river from where we harbor. The attraction of Manchester are the islands which are part of the Ohio River Island wildlife sanctuary park. This part of the river is truly a gem, and should  not be missed by anyone traveling the Ohio River.

With Manchester as our destination, we loaded all six of the kids, kayaks, the inside dog, and our wet bike, collected the dock lines and made for Manchester. All the pre flight checks took longer than I expected, and by the time we were ready, the morning was fading. Having been off of the water for three seasons, I cant tell you  how good it felt to be watching our stern wake on the pond still Ohio River.

The first thing I noticed about how the boat cruises is how quiet it is. All the insulation seems to have paid off. I have a decibel meter on my phone, and checking levels in the wheel house found us with 64 decibels. If I closed the windows, the decibel readings fell to 60. The same level of decibel is in the salon, and a bit higher at 67 in our cabin adjacent to the engine room.

After our over heating event on the trip up from Washington Marine to Skippers, I'm a little gun shy regarding trusting the cooling system. Even though it's her second trip out after bleeding air from the cooling system, one can't help but being apprehensive. I was happy to see the temperature gauge holding good @ 190 degrees after the first hour of running her @ 1700 rpm. I found myself heading downstairs to look inside the engine room door about every half hour. My "looking through the glass" checks were to see if all looked good, verify no water on the sole, and check the temperature of the engine room itself via the thermometer we have stuck to the inside of the door.

After two hours of running Meldahl lock came in to view. Even though I'd done radio checks before this day, I was concerned about our new radio. Two  miles from the lock, I called Meldahl on 13 to say good morning and to inform him we were an up bound pleasure craft requesting to pass through their lock. We were happy to hear the lock master reply telling us to "keep it coming" as he'd make the small chamber ready for us. By the time we got to the end of the lock wall, the doors were opened and with the green light lit, we idled  into the chamber. Having not been through the locks in a few seasons, all were a little rusty on how best to get secured. We've always used our mid ship line, and today was no different. Having a fender tender on the bow was important as we did not know how the boat would land against the lock wall. Now we know where she'll hit, so placing the fenders will more secure in the future. 45 minutes from calling the lock master to exiting the chamber... you cant beat that type of service.
 
Once out of the lock approach, we bumped  her back up to 1700 rpm and settled in for the five  hour run to Manchester. The boat tracks straight as string. Sitting in the bar stool captains seat, I had to only apply minor touches to the wheel to  hold course. It seems that one is able to hold a course for 3-5 miles on river before choosing another course to make a bend. For the most part, the boat would hold course for at least this long, and once I got the feel of her, I only had to touch the wheel to alter course through the long bends. She steers great.

Noting the mile markers, and paying attention to our GPS on our radio ( we don't have a chart plotter or dedicated GPS yet) we were averaging about 7.3 knots @ 1700 rpm. We were headed up river against a slight current, and pulling a jet ski, so I guess this is an OK speed. I'd been a bit happier if we were getting hull speed at this RPM, but I think we're a bit under pitched, and there's not much I can do about that this season.

Five hours later, dropped the Danforth in to the silt bottom at Manchester Island to begin our weekend. Once we were settled in, the kids started getting toys in the water and life was good.

After four days anchored having done a few boat projects and depleted our 300 gallon water capacity it was time to head back down river. A lone fisherman stopped by in his john boat to talk about our boat and ask a bunch of questions. We spoke with him for about 20 minutes before we pulled the anchor. It seems everywhere we go, we find  ourselves answering questions about the boat. Because of  how different she looks compared to other boats in our area, fellow boaters are very interested. We even met a husband and wife up at Manchester who knew us from one of the boat forums I participate on. Super nice folks, and I hope our paths will cross again. Life on the water is as good as we remember it to be, and we're happy to be a part of it again.

Heading down river with the lone john boat fisherman following us taking pictures with his Iphone, I was happy to see our speed had increased to 8.7 knots @ our now familiar 1700 rpm. We were now going with the current, and it was making a difference. Even though we ran the generator hard in Manchester, I started to make an attempt at figuring our main engine fuel burn on the way up. It appears we burned about two gallons per hour, using around 17 or so gallons on our 70 mile run. We'll dial those number in more closely as we get familiar with the boat.

The weather this weekend was a little unsettled, and no sooner than we were loving our 8.7 knots, the wind picked up to 20, and stayed on our nose the whole way home. The river picked up a healthy chop, and for almost all of the day, was white capped. In our previous 30 Carver, this would have made for a somewhat bumpy ride, but in Gragodeo, we hardly noticed the chop. Passing on coming push boats and their 36" roller wake they throw, we would have had to steer into the wakes in the old Carver, but now we find ourselves ignoring the wakes as she hardly even notices them.

The trip down was perfect being out of the wind and comfortable in the wheel house 8' above the water. The locks were busy, and we  had to hold position in the stiff wind for half an hour as we waited our turn. The rudder and steering are extremely responsive, and now that I'm starting to figure out prop walk, we had no problem waiting in position.

The wind held strength as we approached our slip space, and would be on our stern pushing us as we attempted to parallel park in our space. Because of the wind, I decide to call Joe at Skippers to see if he could catch us. We're getting better at bringing her in , but with still being new to us, a stout breeze pushing us in the wrong direction, I was  happy to have Joe help us.

Shutting her down, and cleaning up went quickly, and we were soon walking up the dock with our laundry to our car. She's for sure not "ocean ready", but we had a good first shake down cruise, and there are just a few small issues to look at. One day, she'll be ready for the sea, as we now have the starting at the beginning thing out of the way. It seems so long ago that I was talking to my friend Bill after just having unloaded 40,000 lbs of wheel abraded and CNC cut metal off of a flat bed trailer.
 
Cheers,

Conall






















Thursday, July 31, 2014

In to the great wide open

Gra-go-deo... Gaelic word meaning forever love. The name's not painted on the transom, but a bottle of champagne has been busted on her bow, so it's official in our book.

Preparing for getting her in the water found me working late in to the evening's for days prior Wednesday. No matter how one tries to approach getting stuff done, it all takes time, and there's just not enough hours in a day to get everything completed. So for the last few days, the focus shifted to getting her float ready.

As per recommendations from the designer, I loaded 300 gallons of fuel on her and a good guess at 1/2 of her water capacity which is around 150 gallons ( I"m guessing 300 total gallon water capacity). When It came time to load water, I didn't have a 5 gallon bucket handy to try to  measure the flow rate of the boat yard's system, so I had to guess using my home made water tank level monitoring system. The basics of this is that I installed a "T" in to the water pick up line where it heads to water pump along with two valves and a clear tube stand pipe on the water tank side of the "T". To check the water level, I close the valve to the pump, open the valve to the clear stand pipe, and loosen the cap ( to get rid of the air lock in the clear tube. More on air locks later) so that the tank water level can be visible in the tube. I'm proud to say that the site tube worked great and I was easily able to guess the water level as I could watch it rise in the tube. The only problem I had was that I forgot to dope up the lower threads on the site tube, and when I closed the valve, the water in the tube trickled in to the bilge and collected at the bilge pump. This little bit of water in the bilge had me believing I had a water tank leak until I noticed the empty  tube... big relief. Along with water and fuel, I placed 2300 lbs of ballast in the designated area to save from carting it down the dock at a later date.

The fuel went in to the boat good. I had a truck bring me the fuel and the driver was apprehensive as most boats  he fills cause him grief. The flow rate on his truck was capable of 50 gallons a minute. The two inch fill pipe I used along with the 1" vents allowed the driver to quickly fill the 300 gallons with no spill or burping of the tanks at all, and he commented it was one of the best boat fills he done. I put all 300 gallons of fuel in the port tank to get the driver of site quickly, so I had to use the transfer system to move 150 gallons to starboard, and the system worked great moving 4 GPM. I started a log of fuel and transfer amounts, as I have no fuel gauge, and will have to rely upon transfer log data and a measuring stick to monitor fuel.

Launch day came quick, and I was doing some critical work up until that morning. I invited an engineer friend of mine to help me with the launch duties as Shanon had her hands full with the kids and other family members.

A few problems with picking the boat arose, but I can't say that it was unexpected as no one has ever picked this boat before. The wheel house sits forward and it order to get the slings under the bow far enough, the travel lift was too close to the brow on the wheel house. As she was being lifted, she swung forwards, and the brow hit the travel lift,  slightly bending the brow and one of the horns. She had to be put down to re position the slings, and tie the slings off as to not allow the front sling to let the bow slip out and have her drop to the ground. The damage is minor, and can easily be repaired. I will say that if it were a fiberglass boat the damage would have been more as I think some plastic would have cracked giving one a few day repair. In the case of our boat, a little persuasion on the brow along with a few brush strokes of off white epoxy paint and no one will be able to tell. The air horns are inexpensive Ebay finds, so no big deal on that part. On a project like this, things happen, and that's just the way it is. Gregg at Washington felt more bad at this than I did as they take pride in what they do, and they don't hit boats as they move hundreds a year around their yard.

Watching her drop in to the water found me a bit nervous along with relief. A bit part of my life was being verified and I was happy our family was together to watch this. Other than myself, no one in our family has seen this type of operation, and they were in total amazement watching "the boat" being picked like a toy and lowered in to the water. I took pictures as she touched the water, but I was more interested in getting on board to check for leaks.

The area for leak checking were the PYI dripples shaft seal, the bow thruster tube, the depth sounder transducer, the engine room sea chest, the rudder post, and the holding tank discharge sea cock. Making a big day even better had no leaks found and everything was bone dry.

Stepping back on to the dock to look at the water line was a little disappointing seeing her down on the water line on the stern. The designer told me this model launches stern heavy, and he was for sure right. The swim platform looks good being about 16" out of the water, and the bow looks about perfect. I'll talk to the designer in the next few days to get some insight and find out exactly where we are sitting.

Putting her in and out of gear a few times found the transmission working as it should, so we moved her from the lift pit to the dock. The next few hours found were spent cleaning up and doing a few jobs such as commissioning the generator.

What I really should have been doing was putting a load on the engine to see how the temperature was going to hold. I had topped off the cooling system weeks ago, and had noticed after a few days, the coolant level in the site gauge would drop, so I added more coolant. Knowing we did not have a leak, I figured there was air trapped in the keel cooler, and it would work it's way out once we got her to operating temperature and coolant was circulating. The problem with my thinking was I forgot about how pumps can sometimes respond to air inline, and get air locked. This problem reared it's ugly head two miles from Washington in the form of the high temperature alarm screaming at Shannon while I was in the engine room checking things out. One side of the cooler pipe going in to the hull was hot, and the other side was bone cold as a stone... no circulation... probable air lock.  After shutting her down, throwing the anchor, and adding coolant, we decided to limp back to Washington. Watching the temperature gauge hold steady at 190 while turning 1200 rpm, we changed course and decided to head to New Richmond. We had ten miles to go and were making 5 knots, so once the over heating danger had subsided, it turned out to be great little cruise, and a great way to decompress. 

This boat for sure does not handle like our 30 cruiser, and parallel parking it between two other boats found me calling Joe at Skippers to come down and grab our lines. Our first attempt at getting the stern to kick back to the dock had me discovering just what "prop walk" is. Besides prop walk being a odd name, it's darn frustrating. Docking did go off without a hitch, but the learning curve has found me again.

I'm typing this on the morning after and find myself happy beyond words. A few bugs have to be worked out, but she's in the water and ready to begin finishing. The boat build for sure will continue on through the summer but with a much improved view. As I was alone last night shutting things down, I  heard some strange noise.... water lapping against our steel hull...perfect.

Cheers















 

Wednesday, July 23, 2014

I'm running out of places to stack my tools

Late on Sunday afternoon I had just nailed in the last piece of shoe molding, and after surveying my build, I sort of realized I had nothing else to nail up. I had nothing else to rip, and nothing else to cross cut. The next thing I did was throw every piece of lumber off the boat to be hauled away in my truck ( well almost every piece... I stashed a few bits in the engine room). Once the lumber was off the boat, I hauled the table saw off the boat and placed it under the hull, covered with a tarp. Shannon had just spent five  hours giving the below deck areas a thorough cleaning, and along with the left over building material and the lumber I just threw off the boat, we had a very full load for my service truck. Throughout the build I've always had this fear of not having some piece of building material, so I sort of hoard left over material, and today was the day we realized 90% of it had to go. 

I actually have decided to some time soon make a list of things I need to complete in order to launch. Lots of little things have been getting completed along with some big ticket items. I can officially say my bilge pumps are wired, and I have the picture to prove it. I guess I should clarify this a little and admit that two of the three pumps are wired. The engine room bilge pump along with the pump in the cabin area are complete. The pump in the lazzarette is not wired because it's not purchased. The two pumps I have wired are big pumps being Rule 3500's. I had to wire these off the the battery switch panel as these breakers are always hot even if the house bank is turned off. I did have to install 25 amp breakers for each one of these pumps. Using #10 wire, I wired these two pumps to the wheel house so I could see when and if they come on. A pump control  panel seemed to  make sense and the Sea Dog panel appears to be what I was looking for. The panel has a manual and auto mode along with having an audible and visual alarm. If the switch is inadvertently left in the off position, and water rises up to the alarm float, the alarm float along with alarming, will turn the pump on.

We have a few intake and exhaust pipes I had to deal with in regard to insect screens. Using a slice of PVC schedule 40 and cross cutting the slice creates an internal clip that works great holding screen in. You'll have to fool around with how much to remove from the slice,but when you're finished, it gives a nice clean look that's easy to get in and out, holds the screen great, and doesn't corrode.

Because the finished flooring is now complete, we were able to move in the reclining love seat. I've been on too many boats that did not have at least one comfortable seat, and I for sure did not want our boat to be one of those. The recliner sort of buries the book case, but you can still get to the shelves, and that's a small price to pay for a super comfy place to sit.


The counter top fabricators finished the granite tops, and there's not a bad thing I can say about this. Because we have so much wood in the salon, we decided to do away with the wood top on the book case, and use granite. This little detail changes the way this area looks, and is a much appreciated improvement. The guy who made the templates for the fabricator knew what he was doing, and the tops fit like a glove. The installers did a top notch job and we couldn't be more happy. Before we started the install, I had told the template maker we had to glue the tops to the cabinets. True to that conversation, the installers showed up with the adhesive needed to do the work.

We decided to go with an under mount sink, and I'm glad we did for the one reason of being able to fabricate a cutting board that will fit exactly in the sink.

As I've said before, in order to do this boat launch thing the right way, more time is needed on my part to make this launch happen. I keep going back to needing about another year. If we put off the launch to much longer, we're at the end of the summer, and at that point we should just keep her at Washington and finish her up righteous over the Winter. It sure would be nice to have her in the water being 100% complete with nothing left to do... I mean it's only time, right?

Cheers











     

Sunday, July 13, 2014

Started ballast

Anyone who's thinking about building a boat, take some advice from me and don't wait until a few weeks before your anticipated launch to start pouring your ballast.

I don't think I could have picked a worse day to start pouring lead ingots. At noon today the temperature in the shade was 94, and the dew points seem to be in the 70's making for oppressive humidity. I consider myself a pretty tough guy regarding manual work as I'm in decent shape, and I've been doing physical work all my life. I have  no problem admitting that today's task of pouring lead ingots kicked  my ass.
 
The design of the boat calls for 4300 lbs of ballast  under the forward sole. For our ballast, I'm using lead that came from the demolition of an MRI machine. The material is as clean as can be, and with each lead shingle weighing 30 lbs, it's relatively easy to handle.  I must have messed up somewhere at some point, because I only have 3000 lbs of lead on my site. I could have sworn I had 4500 lbs, but I now know for a fact that I'm going to be lite.

Having a skid steer loader at our place made this nasty job a wee bit easier. Moving the lead from the storage area to the melting area was made easier with the loader as was handling the fire wood and moving the freshly pour ingots in to the shop for cleaning up and weighing.

I made a melting pot out of a piece of 12" pipe and framed a stand for it to sit on giving me room for the fire. Lead melts fairly easily, but it helped immensely by using my back pack blower to force feed the fire. The melting pot comfortably handles 200 lbs of lead.  The pour spout is a 1" nipple welded into the melting pot with a 1" 90 and a short length of pipe to get the material to the molds. Before I pour, I have to use a propane torch to heat the pour spout so the lead from the previous pour can be melted in the spout.   I made two molds to try to  help speed things up. Each mold contains six ingots, and once the mold is full, it weighs about 100 lbs. After a pour is made and the lead has set up enough to pick up the mold, I drop the mold forcefully into a spare bucket for the loader to part the ingots from the mold. The problem is that if the lead doesn't part on the first throw, picking up the 100 lbs mold a few times gets tiresome.

Using a circular saw to cut the thin piece of lead between each ingot is how I process the ingots prior to weighing each ingot. I write the weight on each ingot so I can keep track of how much lead is going into each ballasts compartment.

I  now know I'm going to be  lite on the ballast, so the question is how will this effect my launch. Out of the 4300 lbs designed, I think I'm going to end up with 2700 - 3200 lbs installed for launch. Because the boat is going to spend the rest of the season on the Ohio River ( about as tame a mill pond as one can find), I think I'm going to be OK. If I was launching at the Ocean or Gulf, I'd feel a lot less comfortable being lite, and for sure would not try to go off shore without the designed ballast.  I'm going to run this scenario past the naval architect and see what  he says.

For some reason, I thought I'd get all this ballast poured in one day. Today's pour netted me 1300 lbs of ingots.  

Cheers










Sunday, July 6, 2014

Flooring

As much as we wanted to put off installing finished floors, the last two days found me installing the Cork flooring in the wheel house and salon. The flooring down below in the cabins is going to be carpet, and it for sure is going to wait until we go through some sort of sea trials and a few shake down cruise's.

We've committed to the last week in July for our launch, and with the launch date rushing upon us, I started to finalized a few more systems. AC power comes on board from shore via two 30 amp service cables and is distributed via two AC buss's in the main on board electric distribution panel. During construction, I've been using an extension cord to power the on board distribution panel and as a result, I have loaded up one AC buss. Because we intend of having an inverter along with our generator, I want all the inverter loads on on AC buss, and all the heavier loads on another AC buss. This way, when an inverter is added, it should be a fairly simple upgrade as all the correct loads will be on one buss. So today, I took an hour of time and switched all the heavy loads like the battery charger and air compressor to the correct buss, and move the fridge and microwave to the other buss. The real reason I did this is because I had left over Chinese food for lunch, and I wanted to heat it  up in the microwave without using an extension cord. The other big ( heavy is a better description) was to mount the two 30 amp isolation transformers. Each transformer weighs 75 pounds so I doubled up the plywood on the forward wheel house bulkhead to help spread the load out some. The forward bulkhead is stout in it's own regard, but having another 3/4" of plywood to give the lag screws something to bite into made sense. The transformers are not wired to the AC system yet, but this is a simple job that will take about an hour of time.

The flooring we chose is a natural Cork plank measuring 5 1/2"W x 36" L. As of right now, there's nothing bad I can say about Cork flooring. The stuff feels great under foot, it's sustainable, supposedly extremely durable, has great insulating and sound deadening values, and was a breeze to install. We chose a floating floor vs a glue down floor, and again I could not be more pleased. The floor is designed to be installed over a foam underlayment that adds  more sound and insulating  values to the floor. The underlay is also designed to help the floor from not moving. It is recommended to leave an expansion gap along the width of the floor, and I just used 1/4" plywood between the flooring and the wall to hold the floor firm while I did the install. Once the installation was complete, I removed the plywood spacers.

Because of the expansion joint, I'm going to have to trim things out with a shoe molding. I'll contact my lumber guy in the morning and see about having some Cherry  milled in to a clover profile. I've not measured, but it won't take  much, and I'd guess 100' should do it.

I held all the cabinetry case work up off of the metal floor, by about a 1/2", and that elevation turned out to be barely enough. I was cutting things a little too close. All the drawers and doors are good for clearance, but in the wheel house, the door under the wheel is clearing by less than a 1/4. The fridge is also going to be a tight squeeze regarding height, but it too should go. We'll know soon enough on the fridge, as it's supposed to get delivered sometime on Tuesday.

Now seemed like a good time to get rid of the construction grade steps going from the salon to the wheel house. The steps are 26" wide and have 12" treads with 5 1/2" risers. In regard to steps, that's about as good as it gets regarding the ratio between rise and run. Because of how much room I'm afforded with the steps, we decided to  hinge them to make a decent storage cabinet for either canned goods or bottled water. I'm going to guess, we'll be able to fit two case's of bottled water under the steps. I milled the lumber for the steps in the barn early this morning, and spent most of the morning building the steps before family duties called me away from the boat. Granted there's no finish on the steps yet, but the color difference between the aged Cherry and the freshly milled stock is quite a difference.

Of course there's still a boat load of work that needs to be finished prior to launch, but getting the floor down really gives us a sense of finish. The counter tops are being fabricated and once their completed, the  level of finish will be where we want. There are a few critical jobs that have to be completed prior to  launch, and one of those is the ballast. I've built a melting furnace, and have my molds  welded up and have a few ingot pours under  my belt figure out what I need to do. I have two molds that each form 5 ingots. I have all the lead I need in the form of lead sheathing from an MRI demolition job, and weather permitting I'm planning of pouring ingots all day next Sunday.  I don't know if I'll get all 4500 lbs of ballast poured, but I think I'll be able to get the lions share done, and hopefully enough to safely launch her.

How will she sit on her water line? Hopefully, we'll find out soon enough. In  case anyone is curious, the anti foul is 2 1/2" above her drawn water line.

 Cheers

Monday, June 30, 2014

Come and go blues

"Come And Go Blues", a great song by the Allman Brothers, but also a fair summary of our canceled launch date. We had scheduled with the boat yard to drop us in the water on July 10, but life and boat building has again collided, so that date is going to get pushed back.  She's able to be launched, but a situation with  my 81 year old mother found Shannon, my sister, and myself pulling together to help mom, and less important things had to be shelved.  Anyway, a launch is imminent, but it will be later in July, or early August.

Boat building is still moving forward. With the devil being in the details, I'm at the stage where getting things completely finished is high on my list. I'm putting to bed quite a bit of work hoping to not have to re-visit these projects again. I'm actually to the point where I can start to think about hauling some left over construction material off of the boat.

I had to dig the welder out of the forward cabin and make some brackets for the throttle and transmission shift cables. The correct length cables arrive at the boat early in the week, and I finalized  the installation late in the week. Listening to Terry at Washington Marine was a prudent move on my part and having him order the correct length cables was worth it. The shift motion is firm and easy on the touch, and I'm happy with how well the throttle control is.

While I had the welder out, I made a bracket for mounting the air horns that will sit on the bill of the wheel  house, and  mounted the horns. The junk air solenoid valve that came with the horns did not work, so the only way to test the horns was to use the blow gun. The horns work well, and the 170 decibel rating makes your ear sting if you're standing in front of them. A  new solenoid switch is on the way.

While I was welding on top of the wheel house, I welded in three couplings. One coupling for the air horns, one coupling for the VHF cable, and the last coupling for a search light.

All the anodes are bolted to the hull.

I decided to install a scoop strainer for the sea chest intake. I was afraid that without a scoop, there might be a tendency to suck the sea chest  dry when we're under way.  Instead of fooling around with welding a bunch of studs to the hull for the scoop, I welded one 1/2" stud, and used a isolator bushing to electrically disconnect the scoop from the hull. I also decided to add a small anode behind the scoop. With only one beefy stud pulling the scoop tight to the hull,  a rubber gasket was also added to help tighten things up and keep the bronze off of the steel.

A big piece of the engine system is ventilation of the engine room. The engine room ventilation is done via a stack that exits up through the center of the boat and out the roof.  The stack is 26" x 26", and is partitioned in the center crating two stacks with one for exhaust, and one for intake. Fans are going to have to be used as I don't think passive ventilation will work.  Once the water tight engine room doors are closed, the room is now air tight with only the stack allowing air in or out. So,  if I pull air in to the now  pressurized engine room via a fan, the air now has no choice but to exit the engine room via the exhaust side of the stack, forcing out the hot engine room air. The key here, in my opinion is not letting the intake air to short circuit. For the short circuiting issue, I decided to create a shroud in the stack on the intake side, and mount the intake fan in a precisely cut hole in the shroud. The shroud was made using scrap aluminum left over from the scrap aluminum I used to sheath the engine room sole. The shroud is bolted in place so it's easy to remove or expand, and I mounted the fan using threaded rivets, so that too is easy to replace. I purchased two 9" axial fans from Delta T for ER ventilation. The quality of the fan is about as good as one could find with the fan having been built for specifically this application. So yesterday afternoon, I'm down in the 90 degree engine room ( remember summer  has found us), building the shroud and installing the fan. I'm looking at this fan, and doubts are filling my mind. " I should have gone with the 11" fan". " There's now way this fan is going to  do what I want it to do, it's to damn small". With the fan installed, I decided to energize it even though I did not have proper wires run from the wheel house. Using the hot wire for the ER lights outside the ER door in the master cabin, I powered up the fan. Man, was I surprised  how much air that thing put's out, and how relatively quiet it is. The fan is supposed to be rated at 750 CFM, and the old head in front of the fan test tells me it's pushing out 754.  Because the temporary fan power wires are running from the master cabin through the ER water tight door, I could completely close the doors to the water tight position for fear of cutting the wires, so the door dogs were only about 1/4 engaged. The door was hitting the gasket, but not compressing it, and I could tell this by feeling how much air was short circuiting out the door... not a lot, but I could feel it. That all looks good, so lets go roof top and see what's happening at the stack funnel. Up on the roof, the first thing I noticed is that the fan seems louder up top. The second thing I noticed is how much air is pouring out the exhaust side of the stack. I could sort of feel air being pulled in on the stack's intake side, but it's difficult to feel with ones hand. Using a garbage bag, I placed it in front of the intake Louver, and the baggie was immediately sucked into the grill. If I did not get insect screens with the Louver, the baggie for sure would have been sucked down in to the stack and into the fan. The last thing I wanted to check was the amperage draw which I found to be 9 amps. Most times, a few small things together can add up to a large thing as to how things  perform. "The devil's in the details" . While the shroud fits good, I decided to use some duct tape to seal up the edge of the shroud where it hits the ceiling. 

As I said before, I bought two of these axial fans for the ER. The other fan I'm going to install in the aft corner, pushing air towards the work bench. Because of the amperage draw, I have to decide if I want to use two circuits or one. I'm inclined to use two circuits as I might be able to get by using only one fan. The intake fan is for sure going to be running 100% of the time the engine is running along with some time after the engine is stopped to help with cooling the engine room down. The pushing fan might not need run as much, and given that it will see less duty, it should last much longer. If this proves to be the case, the less run pushing fan will also double as a spare fan to be used to replace the intake fan for when it fails. The intake fan for sure  has to run, so putting the fans on separate circuits gives me some redundancy.
 
The next step to finish ventilation project is to pull the wires and land them in the wheel house. While I'm pulling wires, I might as well pull wires for the fresh water pump along with the bilge pump switch's. I have six spare DC conduits installed from the wheel house to the ER, so this one wire pull will fill one of the conduits.

I might as well add that there's a solid day of cleaning for two people once we pick a launch date.... she's a dirty mess.

 Cheers 

Wednesday, June 18, 2014

Paint it black

Fathers day weekend found me spending two days getting the anti foul paint on the bottom. Saturday was spent scuffing the bottom and welding anode studs in place. Sunday had me power washing off the scuffing dust, taping the water line, and rolling on two coats of anti foul. This is one of those jobs I'd been blowing off and avoiding, but she can't go in the water without this bit of work and it is now off of the list.

The week before, my bud, aluminum sail boat builder, and artist Brian Russel ( THE ART OF BOATBUILDING ) was in town to dedicate a sculpture he built, and stopped by to check on progress. While he was on my site, he gave me a hand installing the saddle for the 10" hydraulic bow thruster. Having another set of skilled hands makes a difference sometimes, and getting the thruster saddle in position while another person is inside working the bolts is a big help. The saddle is a permanent part of the bow thruster which is bolted to the tube and sealed with 5200. The saddle is not meant to be removed as are the other components of the thruster. The thruster leg, and the motor, are fastened to the saddle. The thruster is a 10" hydraulic unit producing 15 hp of thrust. The thruster is powered by a live PTO driven straight off of the Twin Disc transmission.  It was built and designed by Key Power Inc. and it's been nothing but a great experience dealing with Jim at Key Power. The component castings are excellent, as well as all the machining. All the parts are machined on five axis CNC machines and it shows by how well everything fits. Having the bow thruster installed now makes the front of the boat water tight, and it's checked off of the list. It's amazing how little space the hydraulic thruster takes up.

The last part of the water tight work was getting the prop shaft installed along with the drippless shaft log seal. I went with PYI on the shaft seal, and we'll just have to see how that works. The installation was pretty straight forward with no issues at all.  I will say that the bilge is filthy, as is the rest of the boat. There's a good two days of cleaning that needs to be done.

I had ordered the control cables for the throttle and transmission, and Washington Marine had some cables on their shelves that were longer that what I had measured, but told me to see if they could work. The next to nothing price they were going to sell me the cables for was worth trying to make them happen, but in the end, they were too long. The correct length cables should be in by the end of the week or early next week, and once that happens, I'll get them installed.

There's lots to do before I can order up the travel lift to make the 1500' carry to the river, so I'm going to keep telling everyone I have a list that I keep working off of, and keep checking items off of my fictional list.

Cheers